Doha, Qatar: The Public Works Authority (Ashghal) is carrying out works to prepare connections to the stormwater drainage network on Street 284, along with kerbstone works on Waab Al Naba’a Street, as part of the remaining road and infrastructure works project in Mebaireek (Package 2) in Rayan area.
Ashghal' was established in 2004 as an independent body responsible for the design, construction, delivery and management of infrastructure projects in Qatar.